Unloading facility

Unloading facility

Unloading facility

Granite Import Benelux BV / Zwagerman Offshore Services

  • Unloading facility
  • Unloading facility

Information

Description:

Handling of broken granite / bulk between wharf and ship  and / or ship using a pontoon with cranes.
- Pontoon: Dimensions 80 x 24 x 5 m., deck load  20 ton per m2 with 2 spud poles.
- Cranes: 2 cranes of 300 tons capacity, equipped with griper.
- Unloading capacity up to 1500 tons / hour

Unloading and / or storage and transhipment of sea-going vessels with 'aggregates' (granitestones from 0 to 200 mm thickness, density 1.6/1.7) and / or bulk otherwise.
Unloading  will take place from Monday, June 20, 2011 in the Australian port, location Granite Import, Amsterdam.